-
Posted by
Two Blokes Jul 22 -
Filed in
Stock
-
10 views
Oriole Resources PLC (AIM:ORR) has confirmed that drilling at its Mbe project in Cameroon has extended the sub-surface gold system, with recent results pointing to a strike length of at least 300 metres and mineralisation open in all directions and at depth. The London-listed explorer reported that recent holes from its maiden drilling programme at the MB01-S target returned several gold-bearing intersections.